Whanjazhai Yellow River Diversion | China
Completed in: 2001

International expansion and large-scale management. Excavation and supervision of 88.4 km of hydraulic tunnels, of which 86.6 km by TBM, with ad hoc designed mechanical and logistical solutions. The project includes the supply, design and management of multiple Double Shield TBMs. The project consolidated SELI’s ability to operate on multiple fronts with multiple fleets on construction sites in remote areas.
Technical data
Excavation diameter
4.85 m
Tunnel length
86,800 m
Geology
Limestone-Sandstone
Type of support
Prefabricated segments
Client
Wan Long Joint Venture / CMC / Impregilo
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy




