Val Lemme | Italy
Completed in: in progress

A critical tunnel lot for the completion of the Terzo Valico dei Giovi, this project, carried out using the traditional excavation method, tackles difficult, squeezing ground in the presence of gas.
The difficult conditions and behaviour of the formations traversed required the modification and reinforcement of the primary supports installed at the face as well as the creation of an inverted arch, piers and cap in sequence at a very short distance from the face.
Controlling the deformations and prompt, quick intervention to ensure stabilisation and coating help prevent face instability and collapses.
In order to create this work, it was necessary to develop technology and deploy an impressive fleet of explosion-proof vehicles in the field.
The critical geological conditions and the almost continuous presence of gas at the face require very stringent safety procedures.
Technical data
Excavation diameter
10.18 m
Tunnel length
6,849 m
Geology
Sedimentary deposits
Type of support
Reinforced concrete coating
Client
COCIV (Consorzio Collegamenti Integrati Veloci)
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy