Poza Honda | Ecuador


Excavation diameter

4.04 m


Tunnel length

15,500 m


Geology

Sandstone


Type of support

Prefabricated segments


Completed in

2001


Client

Odebrecht Servicos No Exterior Limitada


World record for monthly output of mechanised tunnel excavation, 2333 m excavated and lined in one month of work, a record still unbeaten.

In this project, SELI Overseas developed “separate space” backup technology, designed by the company to increase the safety and productivity of the TBMs.

The extraordinary output levels achieved testify to the efficiency of the new backup system, and the absence of accidents in the tunnel supports the general “separate space” backup approach.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero