Beles Headrace | Ethiopia
Excavation diameter
8.10 m
Tunnel length
11,823 m
Geology
Basalt, tuff, rhyolite, lacustrine deposit
Type of support
Prefabricated segments
Completed in
2009
Client
Salini S.p.A.
Multi Mode TBM, capable of excavating in both Double Shield and EPB modes, to quickly construct tunnels in the complex geological formations characteristic of this hydroelectric plant.
For this project, SELI Overseas developed the design of a new type of Multi Mode TBM, capable of excavating both in double shield mode when in rock and in EPB mode when in loose soil.
The success of the project and the timely completion of the tunnel excavation confirmed the soundness of the innovative design choices made.
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy












