Abdalajis East | Spain


Excavation diameter

10.00 m


Tunnel length

7,043 m


Geology

Limestone, sandstone


Type of support

Prefabricated segments


Completed in

2007


Client

ADIF


Successful completion of the “impossible” tunnel on the Cordova-Malaga High Speed line; this is thanks to the development of a new design for the TBM that will be replicated in many projects around the world.

The Spanish construction giant, Dragados, chose SELI Overseas as a specialist partner for the execution of this project with TBM, for the most part developed in clay-rich, squeezing ground conditions that many technicians and university environments considered impossible to deal with using TBM.

For this challenge, SELI Overseas developed a double shield TBM with highly conical, short shields, also equipping the machine with advanced soil pre-treatment systems.

Although the formations crossed were fully in line with expectations in terms of instability and deformations, the TBM was able to overcome all the difficulties encountered and drilled the tunnel within the contracted timeframe, with a level of technical success that set the standard in the world of mechanised excavation.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero