Kishanganga | India
Excavation diameter
6.10 m
Tunnel length
14,630 m
Geology
Basalt, andesite, siltstone, granite, granodiorite
Type of support
Prefabricated segments
Completed in
2014
Client
Hindustan Construction Company Ltd
The only mechanised tunnel excavation project successfully completed under the great overburdens of the Himalayas was completed with record output levels.
For this project, SELI Overseas developed the design of a new type of Telescopic Double Shield TBM, the “Double Shield Universal”, with very conical shields, high thrust and overcutting capacity.
This new design made it possible to overcome the squeezing and converging ground formations typical of the Himalayan mountain range and the large overburdens under which the tunnel route ran.
This project made it possible to build tunnels that were previously considered impossible.
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy