Doha Underground – Gold Line | Qatar


Excavation diameter

6.83 m


Tunnel length

5,400 m


Geology

Limestone


Type of support

Prefabricated segments


Completed in

2015


Client

JV ALYSJ


The Gold Line tunnels of the new Doha underground were completed in two years from the start of work.

The execution of the main section of the Gold Line in Doha in record time was accompanied by a quality of execution superior to that of the most qualified competitors.

In this work, innovative real-time geoelectric survey technologies were implemented for the formations to be excavated in front of the TBM.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero