Quadrupling of the Fortezza-Verona railway line, Fortezza-Ponte Gardena section
Completed in: in progress

The works assigned to Seli concern the construction of the tunnel with EPB TBM from the Forch Adit for a total length of 1,29 km and, optionally, the tunnel with Dual Mode TBM from the Funes Adit, including the Gardena Tunnel up line and down line, as well as the interconnection tunnel even line and odd line, for a total length of 16,243 km.
Technical data
Excavation, lining and backfilling behind the segments with EPB TBM for approximately 1.3 km of tunnel, plus 16.3 km of tunnels (BP + BD Gardena) with a Dual Mode TBM.
Excavation diameter
FORCH: 11,05 m
Gardena twin tunnel: 9,68 m
Tunnel length
EPB TBM: 1,3 Km
Dual Mode EPB TBM: 16,3 Km
Geology
Forch: Glaciolacustrine deltaic deposits, alluvial deposits, phyllites;
Funes: Andesitic and trachyandesitic dykes, phyllites (carbonaceous, quartz-rich, with garnet), paragneiss
Type of support
Precast concrete segment
Client
Consorzio Dolomiti (WEBUILD/IMPLENIA)
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy