Val Viola | Italy
Completed in: 2004

SELI built 18.8 km of tunnel for the “New Val Viola Canal” hydroelectric project, in complex mountain contexts with dolomites, metapelites and gneiss. An excavation diameter of 3.70 m with a Double Shield TBM and a lining with prefabricated segments 20 cm thick. A project that strengthens the company’s ability to work in Alpine geologies and remote construction sites.
Technical data
Excavation diameter
3.70 m
Tunnel length
18.800 m
Geology
Filladi Hotels
Type of support
Prefabricated segments
Client
A.E.M. Milano
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy



