Orichella e Timpagrande | Italy
Completed in: 1979

The telescopic Double Shield TBM was born. As part of the construction of the main tunnels of the project, SELI and Robbins developed the technology that allows to continuous excavation in deformable and complex ground/rock conditions. It became an innovation that set sector standards for decades.
Technical data
Excavation diameter
4.32 m
Tunnel length
4100 m
Geology
Granite
Type of support
Prefabricated segments
Client
ENEL – Italian Power Corporation
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy



