Orichella e Timpagrande | Italy


Completed in: 1979

The telescopic Double Shield TBM was born. As part of the construction of the main tunnels of the project, SELI and Robbins developed the technology that allows to continuous excavation in deformable and complex ground/rock conditions. It became an innovation that set sector standards for decades.

Technical data


Excavation diameter

4.32 m


Tunnel length

4100 m


Geology

Granite


Type of support

Prefabricated segments


Client

ENEL – Italian Power Corporation


Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero