Cairo Metro, Line 4 | Egypt


Completed in: in progress

As part of the construction of Cairo Metro Line 4 in Egypt, SELI Overseas is providing technical assistance to the Egyptian client Petrojet, a member of the local consortium.

The project is particularly challenging: 5,295 metres of tunnel excavated beneath the ground of an ancient civilisation, using a Mix-shield/slurry TBM with a diameter of 6.73 meters.

Technical data


Technical assistance service on site to Petrojet. SELI’s “Technical Assistance” includes Engineering Services, Assembly of Equipment including the TBM and Assistance in the Excavation of the tunnel.

Excavation diameter

6,73 m


Geology

Sand, Silt


Type of support

Precast concrete segment


Client

Petrojet


Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero