Lonato Tunnel | Italy
Completed in: in progress

As part of the High-Speed/High-Capacity (HS/HC) railway line Turin–Venice, on the Milan–Verona section and specifically the functional lot Brescia–Verona, located south of Lonato del Garda, the Lonato natural tunnel is the most complex structure within the Lonato tunnel system. Built using the tunnel boring machine Martina, it consists of a twin-tube tunnel, with a single track in each tube, crossing beneath the local industrial area and the A4 motorway section between Brescia Est and Verona.
Technical data
TBM excavation, lining and backfilling for approximate 9,50 km with a EPB TBM. Excavation of two twin tunnels of approx. 4,75 km.
Excavation and lining of no. 12 tunnel’s link cross passages and no.29 technological niches.
Tunnel invert’s concrete filling after completion of excavation.
Excavation diameter
10,03 m
Tunnel length
9,50 km
Geology
Moraine deposits: heterometric gravel, sand, cobbles, boulders, clay.
Type of support
Precast concrete segment
Client
CEPAV Due
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy