Completed in: 1994

The Evinos–Mornos project, one of the longest hydraulic tunnels built with a TBM, required the excavation of 30 km under some of the most complex geological conditions in Europe: flysch, abrasive cherts, overthrust zones and overburden up to 1,300 m. SELI operated two Double Shield TBMs simultaneously to meet an accelerated schedule, completing the work in less than 3 years. The tunnel required advanced technical solutions: a cutterhead with the possibility to overcutting excavation systematically in converging squeezing sections, hybrid linings (prefabricated segments and in situ casting), and special methodologies to manage frontal collapses, squeezing and the widespread presence of methane in the rock mass being traversed. It was a project that brought together SELI’s ability to operate across great lengths through extreme terrain, managing multiple fronts simultaneously and stabilizing the excavation cycle even in the most unpredictable contexts.

Technical data


Excavation diameter

4,0-4,2 m


Tunnel length

29.033 m


Geology

Clay and limestone


Type of support

NATM


Client

Ministry of Public Works


Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero