Evinos – Mornos | Greece
Completed in: 1994

The Evinos–Mornos project, one of the longest hydraulic tunnels built with a TBM, required the excavation of 30 km under some of the most complex geological conditions in Europe: flysch, abrasive cherts, overthrust zones and overburden up to 1,300 m. SELI operated two Double Shield TBMs simultaneously to meet an accelerated schedule, completing the work in less than 3 years. The tunnel required advanced technical solutions: a cutterhead with the possibility to overcutting excavation systematically in converging squeezing sections, hybrid linings (prefabricated segments and in situ casting), and special methodologies to manage frontal collapses, squeezing and the widespread presence of methane in the rock mass being traversed. It was a project that brought together SELI’s ability to operate across great lengths through extreme terrain, managing multiple fronts simultaneously and stabilizing the excavation cycle even in the most unpredictable contexts.
Technical data
Excavation diameter
4,0-4,2 m
Tunnel length
29.033 m
Geology
Clay and limestone
Type of support
NATM
Client
Ministry of Public Works
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy