Bergen Point Water Treatment System Outfall Tunnel | USA


Completed in: 2022

The project consisted of a submarine sewer tunnel in the State of New York built with cutting-edge techniques, such as ground freezing and use of Slurry TBM.

In particular, ground-freezing technology was the most widely used method to stabilize the soil during shaft excavation.

An innovative Slurry TBM was used for the excavation of the underwater tunnel, considering it was capable of advancing initially in pipe jacking mode and later by installing lining rings in prefabricated segments.

The sandy-clay nature of the formations required the installation of a sludge treatment plant enhanced with centrifuges capable of separating even the finest portions of the soil.

This project was awarded the prize for best infrastructure construction site in the US for 2021, in the category of projects under $500 million.

Technical data


Excavation diameter

3.81 m


Tunnel length

4,328 m


Geology

Clay, silt, sand, gravel


Type of support

Prefabricated segments


Client

Suffolk County – Long Island (New York)


Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero