Algiers Metro | Algeria
Completed in: 2025

The Algiers Metro project that involved SELI Overseas aims to connect the city center to the airport. In fact, it extends the Metro line between the El Harrach station located in the historic center of the city and the airport area where the Aéroport station will be built. The project consists in the construction of the subway tunnel with a mechanized method using an EPB type TBM having an excavation diameter of 10.5m. The TBM has passed through 8 stations already built and 10 ventilation shafts with transversal connection tunnel, along a route that extends for approximately 9.5 km.
Technical data
TBM excavation, lining and backfilling for approximate 8,60 km with a EPB TBM.
Excavation performed in two steps:
‐ Excavation of approx. 5,7 km from the Starting station to the Airport station;
‐ Dismantling the TBM and transport from the Airport station to the Starting station;
– Excavation from the starting station of the remaining 3,8 km;
Excavation diameter
10,5 m
Tunnel length
9,5 Km
Geology
Sand, Silt, Clay, Weak Sandstone and Weak Limestone
Type of support
Precast concrete segment
Client
Cosider Travaux Publics
Other featured projects

Val Lemme | Italy

Radimero | Italy

Serravalle | Italy

Lonato | Italy

Suffolk County | USA

Tsuen Wan | Hong Kong

Poza Honda | Ecuador

Beles Tailrace | Ethiopia

Beles Headrace | Ethiopia

Kishanganga | India

El Alto | Panama

Xe-Pian Xe-Namnoy | Laos

CCD Grande Dixence | Switzerland

Vancouver Underground – Canada Line | Canada

Milan Underground Line 5 | Italy

Doha Underground – Gold Line | Qatar

Algiers Underground | Algeria

Abdalajis East | Spain

Railway to Jerusalem – Line C | Israel

Lodz Railway Tunnel | Poland

Los Bronces | Chile

Cairo Underground | Egypt

High Speed railway Messina – Catania | Italy