Railway to Jerusalem – Line C | Israel


Excavation diameter

10.00 m


Tunnel length

23,200 m


Geology

Limestone


Type of support

Prefabricated segments


Completed in

2014


Client

Shapir-Pizzarotti Joint Venture


The main tunnel of the new railway line between Tel Aviv and Jerusalem speaks Italian.

For this railway project, the first in Israel to include the use of mechanised excavation technology, Italian general contractor Pizzarotti chose SELI Overseas as the specialist subcontractor for the excavation of the two parallel tunnels with double shield TBMs.

This project consolidated SELI’s expertise and executive capacity in the railway tunnel sector, a sector that is now a driving force in Italy and worldwide.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero