Radimero | Italy


Excavation diameter

9.89 m


Tunnel length

8,100 m


Geology

Sandstone, marl, schist, river deposits


Type of support

Prefabricated segments


Status

in progress


Client

COCIV – RFI Italian Railways


Terzo Valico dei Giovi – A model construction site in terms of technology, innovative solutions and respect for the environment to excavate with two 9.8 m TBMs in asbestos formations and in the presence of gas.

In this project, SELI Overseas was a pioneer in the development of special technologies, plants and procedures for excavating with TBMs in asbestos soils.

These technologies involved all the plants, from the TBM to the tunnel transport and ventilation systems as well as those for the external management, bagging and transport to landfill of the material contaminated by asbestos.

The presence of gas in the second part of this long tunnel then required the modification of the TBM in the tunnel to make it compatible with excavation in the presence of gas according to the regulations applicable in the country.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero