Vancouver Underground – Canada Line | Canada


Excavation diameter

6.10 m


Tunnel length

4,800 m


Geology

Sandstone, glacial till


Type of support

Prefabricated segments


Completed in

2008


Client

SNC Lavalin


Vancouver’s first underground line connecting the International Airport and the City completed in time for the 2010 Winter Olympics.

In this project, after the Athens and Turin underground, SELI Overseas confirmed itself as the most efficient, experienced company in the construction of underground lines in a short, set timeframe.

This ability was instrumental in being awarded this job and for its completion in time to put the line into service on schedule.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero