El Alto | Panama


Excavation diameter

6.80 m


Tunnel length

3,240 m


Geology

Lahar


Type of support

Prefabricated segments


Completed in

2013


Client

Hydro Caisan SA


EPB TBM technology is also extended to rock tunnels, completing this difficult hydroelectric project on schedule.

Before SELI Overseas undertook this job, EPB TBMs were used to make tunnels in urban areas and under low overburdens.

In the excavation of the El Alto tunnel, SELI Overseas successfully tested the EPB TBM excavation of a tunnel in mixed formations, with alternating rock, fault zones and loose soil.

Other featured projects


Val Lemme | Italy


Radimero | Italy


Serravalle | Italy


Lonato | Italy


Suffolk County | USA


Tsuen Wan | Hong Kong


Poza Honda | Ecuador


Beles Tailrace | Ethiopia


Beles Headrace | Ethiopia


Kishanganga | India


El Alto | Panama


Xe-Pian Xe-Namnoy | Laos


CCD Grande Dixence | Switzerland


Vancouver Underground – Canada Line | Canada


Milan Underground Line 5 | Italy


Doha Underground – Gold Line | Qatar


Algiers Underground | Algeria


Abdalajis East | Spain


Railway to Jerusalem – Line C | Israel


Lodz Railway Tunnel | Poland


Los Bronces | Chile


Cairo Underground | Egypt


High Speed railway Messina – Catania | Italy


High Speed railway Fortezza-Ponte Gardena | Brennero